NTR 100 COMPLETE Syllabus and Academic Integrity Acknowledgement Arizona State University
NTR 100 COMPLETE Syllabus and Academic Integrity Acknowledgement Question 1 1 / 1 pts I have read the ASU ā¦
MGT302 Quizzes Week 4
Question 1
A noncritical activity with high variance could possibly become critical in some situations.
Correct!
True
False
Question 2
A chart to show time lengths and sequences of project task activities was developed by?
Correct!
Henry Gantt
Rebecca Scott
Suzuki Ishikawa
Nathan Palmer
Question 3
The bars in a Gantt chart show?
Precedence relationships
Activity descriptions
Correct!
Activity start and finish times
Activity resources needed
Question 4
Project risks that are within company control such as poor forecasting are referred to as?
Cost risks
External risks
Technology risks
Correct!
Operational risks
Question 5
The third step in both the CPM and PERT approaches is?
Determine the sequential relationship between all of the activities
Determine the critical path
Identify all project activities and time to complete each activity
Correct!
Develop an activity network
Question 6
Which of the following is not a category of project management risk?
Correct!
Internal
External
Cost
Schedule
Question 7
The time estimate that represents the time to complete the activity if everything goes according to plan is the?
Pessimistic completion time
Least likely completion time
Correct!
Optimistic completion time
Most likely completion time
Question 8
All critical path activities have a slack time greater than zero.
True
Correct!
False
Question 9
The cost associated with reducing an activity duration is often referred to as a crash cost.
Correct!
True
False
Question 10
Modern concerns of project managers include all of the following except?
Risk assessment
Project security
Development of contingency plans
Correct!
Elimination of need for projects
Quetion 11
The DMAIC improvement cycle has been applied to revenue management approaches.
Correct!
True
False
Question 12
All of the following individuals are commonly associated with Six Sigma philosophy and tools except?
Correct!
Hill
Juran
Deming
Crosby
Question 13
Few firms attempt to use both Six Sigma and lean.
True
Correct!
False
Question 14
A quality philosophy that drives a firm to lower prices, higher quality, and fast response is referred to as?
Critical path method
Lean manufacturing
Correct!
Six Sigma
Process capability
Question 15
In Six Sigma, DPMO refers to?
Detections per million opportunities
Detections per manufacturing output
Correct!
Defects per million opportunities
Defects per manufacturing output
Question 16
SQC refers to?
Statistical quality capability
Statistical quality concept
Statistical quality charting
Correct!
Statistical quality control
Question 17
Pareto charts are used to describe process flow.
True
Correct!
False
Question 18
The highest level of Six Sigma training is referred to as Black Belt.
True
Correct!
False
Question 19
The process of preparing to meet quality goals refers to which of Juranās Quality Trilogy?
Correct Answer
Quality planning
You Answered
Quality control
Quality improvement
This does not relate to any of Juranās Quality Trilogy
Question 20
In Six Sigma, the goal of quality perfection is represented by having a process sample average that falls below a control limit that is placed how far above the true process mean?
Correct!
Six standard deviations
Three standard deviations
Four standard deviations
One standard deviation
Ā
NTR 100 COMPLETE Syllabus and Academic Integrity Acknowledgement Question 1 1 / 1 pts I have read the ASU ā¦
HEP 456 Module 6 Section 14 Communication and Dissemination of The Findings HEP 456: Health Promotion Program ā¦
HEP 456 Module 5 Section 12 and 13 Planning for Analysis and Interpretation and Gantt chartĀ Name HEP 456: ā¦